CAIN'S POWER WASHING
Pre-Job Inspection — Staff Use Only
📋 Required Before Every Job
Pre-Job
Inspection Form
Complete this form before any water touches the property.
This creates a timestamped record that protects you and the client.

⚠️ No inspection = No protection. Complete every field before starting.

1
Job Information
✅ Deposit Paid
⚠️ Waived
❌ Not Received
⚠️ No deposit on file. Confirm with Terry before starting this job.
2
Property Check
💧 City / Municipal
🪣 Well Water
❓ Unknown
🛑 WELL WATER — Signed waiver required before work begins. Do NOT start without it.
⚠️ Confirm water source with homeowner before starting.
✅ No pets
🐾 Yes — Secured Inside
❌ Yes — Outside
🚫 Pets must be secured inside. Do NOT start until all pets are indoors and owner confirms.
None observed
Minor — Noted
Significant — Documented
Document damage in notes below and take before photos. Show client before starting.
✅ Covered & Taped
N/A — None Present
Not Yet
Cover and tape all outdoor outlets and light fixtures before starting.
3
Pre-Job Checklist

Tap each item to confirm it's done before starting.

  • Walked property with customer — concerns noted
  • Pre-existing damage identified and shown to customer
  • All outdoor outlets and light fixtures protected
  • Fragile items removed from service area by customer
  • All pets confirmed inside
  • Chemical / treatment plan discussed if applicable
  • Customer knows: stay inside until rinse-down is complete
  • Payment / deposit status confirmed
4
Before Photos

Take photos of the property BEFORE work begins. These protect you.

📷

Tap to take or upload photos

Front of property • Surface areas • Any existing damage

5
Inspection Notes
6
Operator Sign-Off
✅ All Clear — Ready
⚠️ Hold — Issue Noted
🛑 Do Not Start
Document the issue in notes. Contact Terry before proceeding.
🛑 JOB PAUSED — Contact Terry immediately. Do not start until cleared.
📋 By submitting this form, you confirm that the pre-job inspection is complete, all items above have been reviewed, and this record will be timestamped for the job file.
Inspection Complete
Pre-job inspection has been recorded and timestamped.
You are cleared to begin work.
Screenshot or save this confirmation for the job file.